prepared by The Babcock & Wilcox Company, Research and Development Division ; principal investigator, J. G. Feldstein ; prepared for Electric Power Research Institute
Date
[1984]
Series
Research project (Electric Power Research Institute) ; 1236-1/v.2
prepared by Fracture Control Corporation, principal investigators, J.F. Perrin, R.A. Wullaert ; and, University of California at Santa Barbara, Department of Chemical and Nuclear Engineering, principal investigators, G.R. Odette, P.M. Lombrozo ; prepared for Electric Power Research Institute
sponsored by ASTM Committee D-18 on Soil and Rock for Engineering Purposes and Committee E-24 on Fracture Testing, American Society for Testing and Materials, Chicago, Ill., 23-24 June 1980