Alternative System Plan 2A-No Build Alternative: The first alternative system plan...
Analysis of the demand assignment to alternative 2A indicated that 92 type C based aircraft...
...2B contained the same airports as plan 2A, the publicly owned airports were assumed to...
...remained unchanged from those assumed in plan 2A (see Table 149). The results of the...analysis were similar to those for plan 2A. A total demand of 92 C aircraft...
The most significant change from plan 2A was the increase in landing area capacity...
...ground travel time standards as under plans 2A and 2B (see Table 149). Although the...air- ports was slightly different from alternatives 2A and 2B, reflecting the influence of landing...