MARC Bibliographic Record

LEADER01858cam a2200469Ia 4500
001 9963679363602122
005 20040826182516.0
007 he bm--------
008 870211t19841984caua bbt 000 0 eng d
035    $a(OCoLC)ocm15183708
035    $a(WU)6367936-uwmadisondb
035    $a(EXLNZ-01UWI_NETWORK)999966199402121
040    $aZEM$beng$cZEM$dOCL$dOCLCQ
049    $aGZMA
088    $aEPRI-NP-2107
245 00 $aComparisons of simulated process computer calculations with gamma scan measurements at Hatch 1 at end of cycle 3 /$cprepared by General Electric Company, Nuclear Engineering Division ; principal investigators, L.M. Shiraishi, J.E. Thompson.
264 _1 $aPalo Alto, Calif. :$bElectric Power Research Institute,$c[1984]
264 _4 $c©1984
300    $a1 volume (various pagings) :$billustrations ;$c28 cm.
336    $atext$btxt$2rdacontent
337    $amicroform$bh$2rdamedia
338    $amicrofiche$bhe$2rdacarrier
490 1_ $aEPRI report ;$vNP-2107
500    $a"EPRI-NP-2107."
500    $a"March 1984."
504    $aIncludes bibliographical references (page R-1).
513    $aFinal report.
536    $aSponsored by Electric Power Research Institute.$d130-3.
533    $aMicrofiche.$bPalo Alto, Calif. :$cElectric Power Research Institute,$d[1984].$e2 microfiches, negative.$7s1984 caun b
650 _0 $aNuclear fuels.
650 _0 $aBoiling water reactors.
650 _0 $aScanning systems.
650 _0 $aGamma rays$xMeasurement.
650 _0 $aNuclear reactors$xPower distribution.
650 _0 $aNuclear reactors$xComputer programs.
651 _0 $aHatch Nuclear Power Plant 1.
700 1_ $aShiraishi, L. M.
700 1_ $aThompson, J. E.
710 2_ $aGeneral Electric Company.$bNuclear Engineering Division.
710 2_ $aElectric Power Research Institute.
830 _0 $aEPRI report ;$vNP-2107.
994    $aX0$bGZM
997    $aMARCIVE

MMS IDs

Document ID: 999966199402121
Network Electronic IDs:
Network Physical IDs: 999966199402121
mms_mad_ids: 9963679363602122