Workshop report, recommended investigations of sediment transport and deposition for predicting future configurations of Upper Mississippi River System channels and floodplain
Title from title screen (viewed on Feb. 27, 2003).
"September 2002."
Final report to U.S. Army Corps of Engineers for Long Term Resource Monitoring Program Scope of Work Number 6.3 (Sediment and Geomorphology Work Plan).
Includes bibliographical references.
System requirements: Adobe Acrobat Reader.
Mode of Access: Internet at the USGS web site. Address as of 02/27/03: ftp://ftp.umesc.usgs.gov/pub/media%5farchives/documents/reports/2002/02p001.pdf; current access via PURL.