Website Search
Find information on spaces, staff, and services.
Find information on spaces, staff, and services.
Abstract; The fission product data obtained during SM-1 Core I operation (June 1957 - May 1960) is reviewed briefly and interpreted. Evidence is presented to indicate that a fuel element defect was...
Abstract; The fission product data obtained during SM-1 Core I operation (June 1957 - May 1960) is reviewed briefly and interpreted. Evidence is presented to indicate that a fuel element defect was responsible for the high fission product activity level observed in the primary coolant. Relative escape coefficients are calculated and the defect size estimated. Anticipated fission product levels during SM-1 Core II and SM-1A Core I operation are estimated from alpha surface contamination data on completed fuel elements. The importance of in-line sampling for monitoring fission product activity is stressed as well as the need for failed fuel element detection methods.