Provides mileage and elevation along proposed railroad route.
Removed from: Report of the Board of directors of internal improvements of the state of Massachusetts. Boston: Press of the Boston Daily Advertiser, 1829.
Profile No. 1 in five sections, covers roughly 53 mi. between Cambridge and Spencer, Mass.; No. 2 in five sections, covers roughly 41 mi. between Spencer and Springfield, Mass.; Nos. 3 and 4. (on one sheet) with seven sections, covers roughly 53 mi. between Springfield, Mass. and New York State line at Caanan.
Profile no. 1 of a survey for a rail road from Boston to N. York state line at Canaan / by James F. Baldwin, December 1828 -- No. 2. Boston and Albany Rail Road : profile from Grouts Summit in Spencer to Connecticut River, December 1828 / Jas. F. Baldwin, engr. -- No. 3. Boston and Albany Rail Road : profile from Connecticut River to Washington Summit -- No. 4. Boston and Albany Rail Road : profile from Washington Summit to N. York State Line at Canaan, December 1828 / James F. Baldwin, engineer