290 COLLEGE OF ENGINEERING

107. ADVANCED RAILWAY DesicN. I, II; 2 cr. Special problems of an
advanced nature, together with studies and discussions of matters of
current interest in connection with railway engineering. Elective for
seniors and graduate students. Mr. Van Hagan.

111. Susstructures. II; 1 cr. Ordinary and deep foundation work; lec-
tures and problems. Prerequisite: Railways 110. Mr. Van Hagan.

112. Estimates. II; 2 cr. Practice in scaling quantities and preparing
estimates of cost. Prerequisite: Junior standing. Mr. Van Hagan.

ROADS AND PAVEMENTS
See Highway Engineering and City Planning, page 280.

SHOP LABORATORIES

JAMES MORGAN DoRRANS, Assistant Professor of Mechanical Practice,
Superintendent

RICHARD REX BELL, Instructor in Mechanical Practice

BERT BERNARD BRIDGE, Instructor in Mechanical Practice

JOHN B. CLULEY, B.S., Instructor in Mechanical Practice

GEORGE DAvip HitcHcock, Instructor in Mechanical Practice

NICHOLAS FRANCIS HOLLANDER, Instructor in Mechanical Practice

CHARLES FREDERICK PETERS, Instructor in Mechanical Practice

THOMAS PUDDESTER, Instructor in Mechanical Practice

ROBERT NICHOLAS SCHUMANN, Instructor in Mechanical Practice

GEORGE FRANCIS YOUNG, Instructor in Mechanical Practice

1. ELEMENTARY PATTERN MAKING. I, II; 1 cr. Bench and lathe work
in wood. Principles of molding and core making. A knowledge of
common woods. Fee $3.00. Mr. Hollander.

2. BENCH WoORK, FORGE, AND WELDING. I, II; 1 cr. Instruction in the
use of bench metal tools, acetylene and electric welding, splicing, sol-
dering and drill press work, pipe fitting, welding, tempering and
brazing. Fee $3.00. Mr. Schumann, Mr. Peters.

4. LATHE WorRK IN METALS. I, II; 1 cr. Turning, boring, and thread
cutting. Experience in working various metals. Fee $3.00. Mr.
Bell, Mr. Hitchcock, Mr. Puddester.

5. PLANING, SHAPING, AND MILLING. I, IJ; l-cr. Surfacing, slotting
and gear cutting. Fee $3.00. Mr. Bell, Mr. Hitchcock, Mr. Puddester.

6. Toow MAKING. I; 2 cr. Making and tempering taps, reamers, coun-
terborers, turret lathe tools, ete. Prerequisites: Shop 4, 5. Fee
$6.00. Mr. Bell, Mr. Hitchcock, Mr. Puddester.

7. GENERAL SHOP WorK. I; 2 cr. Manufacturing machines, gas en-
gines, etc. Turret lathe practice. Production methods. Prerequi-
sites: Shop 2, 4, 5, 6. Fee $6.00. Mr. Bell, Mr. Hitchcock, Mr.
Puddester.