Table 3-38
Estimates of Locally Hired Contractor Employees During Peak Project Construction



Number of Employees'



job Category



Estimated Number of Locally Hired2



Mine Construction
   Piefitters
   Welders
   Electricians
   Millwrights
   Mechanics
   Equipment operators
   Ironworkers
   Carpenters
   Laborers
   Cement Masons
   Shaft and drift miners/rock drillers
   Hoistmen
   Surveyors
   Supervisors
   Engineers



Iface Facilities Construction
  Boilermakers



engineers



chanics/ oilers
sons/ finishers
rodmen)



  70
  65
  195
  210
  70
  60
  20
  160
  70
  70
  5
  5
  135
  25
1,165 Total



reflect employment needs within job categories.
, with project employment totals.
.esearch Institute, 1986.



Due to timing differences, totals may



.ollow a national competitive bidding policy in the procurement of all supplies,
services,
t. Study area companies that could benefit from construction activities (assuming
they
ompete with state, regional, and national firms) include the following:

l contractors
contractors
intractors (heating, ventilating, and air-conditioning)


Contractors
L1 steel fabricators
luipment lease/hire
Contractors
of building/construction materials, including electrical
nbing supplies
nd excavating contractors



- 175 -



  5
  5
  10
  10
  15
  10
  15
  10
  15
  10
  30
  10
  5
  10
  5
165 Total



1
2
2
2
5
5
2
5
15
5
5
4
1
0
0
54 Total



.
En
a
pa
Ei
c



  6
  20
  8
210
10
  6
  20
  10
  5
  10
  5
  4
  0
  2
316 Total