LIST OF TABLES

Table    Title                                                          
    _____
                                       CHAPTER ONE

1-1   Annual Metal Recovery and Relative Economic Importance of Metals
        in the Crandon Concentrates                                     
    2
1-2   Major Permits and Approvals Required for the Proposed Project     
  3
1-3    Proposed Mill Production Rate                                    
   9
1-4    Estimated Daily Concentrate Production and Storage Capacity      
  10
1-5    Reagent Use, Consumption Rate, and Storage                       
     11
1-6    Tailings Ponds Information                                       
     14
1-7    Projected Water Quality of Intercepted Groundwater
        and Contaminated Mine Water                                     
     15
1-8    Proposed Effluent Limitations and Projected Effluent Quality
        for Surface Water Discharge to Swamp Creek (from WPDES Permit)  
  18
1-9    Reclaim Ponds Operating Characteristics                          
     19
1-10   Clearing and Grubbing Wastes                                     
     34
1-11   Estimated Maximum Discharges to the Air                          
     36
1-12  Sampling Parameters for Private Water Wells                       
     37
1-13  Wastewater Discharge Monitoring                                   
     38
1-14  Surface Water Quality and Aquatic Ecology Monitoring Program      
  40
1-15  MWDF and Landfill Performance Monitoring                          
     43
1-16   Construction Phase Mitigation Facilities and Monitoring Programs 
   46
1-17  Operations Phase Mitigation Facilities and Monitoring Programs    
  47
1-18   Project Expenditures                                             
     49
1-19   Exxon Estimates of Expenditures Within Wisconsin                 
     49
1-20   Electric Transmission Line Construction Costs                    
     50
1-21   Natural Gas Pipeline Construction Costs                          
     50
1-22  Operations Work Schedule                                          
     51
1-23   Exxon Employment and Wages During Project Operations             
     51
1-24   Project Traffic                                                  
     52
1-25   Petroleum Consumption                                            
     52
1-26   Electrical Demand                                                
     53
1-27   Natural Gas Consumption                                          
     53


                                       CHAPTER TWO

2-1    Ore Reserves and Metal Content of the Orebody                    
     56
2-2    Groundwater Quality for the Glacial Aquifer in the Environmental
        Study Area                                                      
     59
2-3    Results of Chemical Analyses of Bedrock Groundwater Samples
        Near the Orebody                                                
     61
2-4    Lake Water Level Fluctuations                                    
     63
2-5    Stream Gaging Stations in the Environmental Study Area           
     63
2-6    Flow Duration Table for Select Gaging Stations                   
     64
2-7    Water Quality Parameters Being Monitored on the Wolf River
        at Station Z                                                    
     69
2-8    Fish Species Collected from Lakes in the Environmental Study Area
   72
2-9    Fish Species Collected from Creeks in the Environmental Study Area
  73
2-10   Vegetation Types and Percent Rankings for the Project Site and
        Environmental Study Area                                        
     74
2-11   Forest Ownership                                                 
      75
2-12   Concentration of Heavy Metals in Soils and Plants                
      77



- xli -